Results
- 200% increase in artwork output — from 10 to 30–40 artworks per week
- 50% reduction in extrapolations, minimizing risk
- Streamlined stakeholder collaboration and faster approvals
- A scalable platform ready for future automation and reporting
The implementation of WebCenter sets the foundation for our current and future state needs. We’ve only scraped the surface of existing capabilities.


